Share Development Approval Amendment P2025-130 (Amendment to Development Approval P2376) | LOT 4 (No. 8) & LOT 5 (No. 10) Glyde Street, Mosman Park - Joint Development Assessment Panel (JDAP) Application on Facebook Share Development Approval Amendment P2025-130 (Amendment to Development Approval P2376) | LOT 4 (No. 8) & LOT 5 (No. 10) Glyde Street, Mosman Park - Joint Development Assessment Panel (JDAP) Application on X (formerly Twitter) Share Development Approval Amendment P2025-130 (Amendment to Development Approval P2376) | LOT 4 (No. 8) & LOT 5 (No. 10) Glyde Street, Mosman Park - Joint Development Assessment Panel (JDAP) Application on Linkedin Email Development Approval Amendment P2025-130 (Amendment to Development Approval P2376) | LOT 4 (No. 8) & LOT 5 (No. 10) Glyde Street, Mosman Park - Joint Development Assessment Panel (JDAP) Application link

The Town of Mosman Park has received a planning application for a mixed-use development at the above properties.

Key components of the proposal are as follows:

- 48 apartments

- 3 commercial tenancies at ground floor

- Basement level car parking accessed from Waite Lane

- 11 Storeys total (plus two basement levels); and

- Community benefit initiatives including a publicly accessible space (Parklet) proposed at the frontage to Glyde Street and beautification works to the nearby Centenary Park.



Background to the Development Proposal

The introduction of the Town of Mosman Park Local Planning Scheme No. 3 in February 2018 has created new opportunities for mixed-use development within close proximity to Mosman Park train station. This aligns with State Government strategic planning objectives, aimed at providing new opportunities for infill development within existing urban areas.

As most of the opportunities for mixed-use development in the Town’s Local Planning Scheme No. 3 are situated in the Town Centre surrounding Mosman Park train station, a draft Mosman Park Town Centre Plan has been developed to guide the transformation of this area. The development of this plan has been informed by a community engagement program that commenced in November 2017. The Town asked the community to share their vision for the Town Centre and 500 suggestions containing valuable feedback were received.

Combining this feedback from the community with urban design and landscape studies, a vision has been adopted for the Mosman Park Town Centre:

“An urban village which blends architecture, landscape and activity to create a busy and visually appealing place that remembers its past and is distinctive from its surrounds.”

The site of the subject development proposal is situated within the Mosman Park Town Centre.

Design Review of the Development Proposal

With the shift towards mixed-use urban infill development, the State Government has been advocating for Local Governments to engage in early design review of development proposals, with the assistance of expert advice from independent architects, urban designers, landscape architects and other professionals. The integration of design review in the planning process is now a key component of State Government planning policy.

The Town of Mosman Park has welcomed this initiative and has adopted a local planning policy that sets out a process for engaging with developers in a series of three early design review sessions, before a development proposal is submitted for assessment. By engaging in early design review, the Town has the opportunity to contribute to the design quality and evolution of development proposals.

The development proposal that is the subject of this letter has been through its three design review sessions with the Town and its expert Design Review Panel. The applicant has responded constructively to the feedback provided and the development proposal has now reached a point where the Town is ready to share it with the local community.

___________________________________________________________________________________________________________________________

Development Approval Amendment P2025-130 (Amendment to Development Approval P2376) | LOT 4 (No. 8) & LOT 5 (No. 10) Glyde Street, Mosman Park - Joint Development Assessment Panel (JDAP) Application.

UPDATE 10/02/2026: The application for the proposed Amendment to Development Approval shall be considered by the Metro-Inner North Joint Development Panel on February 18 at 1:00pm in the Department of Planning, Lands & Heritage, 140 William Street, Perth or via electronic means. A copy of the meeting agenda is available at the following link:

DAP AGENDA

___________________________________________________________________________________________________________________________

UPDATE 21/12/2021: The The finalised minutes of the Metro Inner-North JDAP meeting on 17 December 2021 have been made available on the DAP website. Should you have any queries, please contact the DAP Secretariat on 6551 9919 or via email daps@dplh.wa.gov.au

___________________________________________________________________________________________________________________________

UPDATE 09/12/2021: The application for the proposed development shall be considered by the Metro-Inner North Joint Development Panel on December 17 at 9:00am via electronic means. A copy of the meeting agenda is available at the following link:

DAP AGENDA

__________________________________________________________________________________________________________________________

UPDATE 02/12/2021: The recommendation for the proposed development shall be considered and determined at a Special Council Meeting on Monday 6 December 2021 at 5:00pm. This meeting is open to the public and held at the Town's Administration Office, 1 Memorial Drive, Mosman Park.

The Agenda and Attachments can be viewed here.

___________________________________________________________________________________________________________________________

UPDATE 18/10/2021: Consultation on the proposal has now concluded. The application is undergoing formal assessment by the Town and will be presented to Council prior to presentation to the Joint Development Assessment Panel. If you have made a submission on the proposal you will be formally notified of future meeting dates.

___________________________________________________________________________________________________________________________

The Town of Mosman Park has received a planning application for a mixed-use development at the above properties.

Key components of the proposal are as follows:

- 48 apartments

- 3 commercial tenancies at ground floor

- Basement level car parking accessed from Waite Lane

- 11 Storeys total (plus two basement levels); and

- Community benefit initiatives including a publicly accessible space (Parklet) proposed at the frontage to Glyde Street and beautification works to the nearby Centenary Park.



Background to the Development Proposal

The introduction of the Town of Mosman Park Local Planning Scheme No. 3 in February 2018 has created new opportunities for mixed-use development within close proximity to Mosman Park train station. This aligns with State Government strategic planning objectives, aimed at providing new opportunities for infill development within existing urban areas.

As most of the opportunities for mixed-use development in the Town’s Local Planning Scheme No. 3 are situated in the Town Centre surrounding Mosman Park train station, a draft Mosman Park Town Centre Plan has been developed to guide the transformation of this area. The development of this plan has been informed by a community engagement program that commenced in November 2017. The Town asked the community to share their vision for the Town Centre and 500 suggestions containing valuable feedback were received.

Combining this feedback from the community with urban design and landscape studies, a vision has been adopted for the Mosman Park Town Centre:

“An urban village which blends architecture, landscape and activity to create a busy and visually appealing place that remembers its past and is distinctive from its surrounds.”

The site of the subject development proposal is situated within the Mosman Park Town Centre.

Design Review of the Development Proposal

With the shift towards mixed-use urban infill development, the State Government has been advocating for Local Governments to engage in early design review of development proposals, with the assistance of expert advice from independent architects, urban designers, landscape architects and other professionals. The integration of design review in the planning process is now a key component of State Government planning policy.

The Town of Mosman Park has welcomed this initiative and has adopted a local planning policy that sets out a process for engaging with developers in a series of three early design review sessions, before a development proposal is submitted for assessment. By engaging in early design review, the Town has the opportunity to contribute to the design quality and evolution of development proposals.

The development proposal that is the subject of this letter has been through its three design review sessions with the Town and its expert Design Review Panel. The applicant has responded constructively to the feedback provided and the development proposal has now reached a point where the Town is ready to share it with the local community.

___________________________________________________________________________________________________________________________

Development Approval Amendment P2025-130 (Amendment to Development Approval P2376) | LOT 4 (No. 8) & LOT 5 (No. 10) Glyde Street, Mosman Park - Joint Development Assessment Panel (JDAP) Application.

UPDATE 10/02/2026: The application for the proposed Amendment to Development Approval shall be considered by the Metro-Inner North Joint Development Panel on February 18 at 1:00pm in the Department of Planning, Lands & Heritage, 140 William Street, Perth or via electronic means. A copy of the meeting agenda is available at the following link:

DAP AGENDA

___________________________________________________________________________________________________________________________

UPDATE 21/12/2021: The The finalised minutes of the Metro Inner-North JDAP meeting on 17 December 2021 have been made available on the DAP website. Should you have any queries, please contact the DAP Secretariat on 6551 9919 or via email daps@dplh.wa.gov.au

___________________________________________________________________________________________________________________________

UPDATE 09/12/2021: The application for the proposed development shall be considered by the Metro-Inner North Joint Development Panel on December 17 at 9:00am via electronic means. A copy of the meeting agenda is available at the following link:

DAP AGENDA

__________________________________________________________________________________________________________________________

UPDATE 02/12/2021: The recommendation for the proposed development shall be considered and determined at a Special Council Meeting on Monday 6 December 2021 at 5:00pm. This meeting is open to the public and held at the Town's Administration Office, 1 Memorial Drive, Mosman Park.

The Agenda and Attachments can be viewed here.

___________________________________________________________________________________________________________________________

UPDATE 18/10/2021: Consultation on the proposal has now concluded. The application is undergoing formal assessment by the Town and will be presented to Council prior to presentation to the Joint Development Assessment Panel. If you have made a submission on the proposal you will be formally notified of future meeting dates.

___________________________________________________________________________________________________________________________

  • CLOSED: This survey has concluded.
    Share Submission Form on Facebook Share Submission Form on X (formerly Twitter) Share Submission Form on Linkedin Email Submission Form link
Page last updated: 25 Aug 2026, 02:41 PM